# Scaleline > The quantity layer for new residential building across Australia. Scaleline (Scaleline Pty Ltd) measures new homes from drawings: an engine measures the quantities, estimators check and own the result, and a sourced bill of quantities is delivered in 24–48 hours for a fixed, published fee. The office is in Adelaide. Scaleline measures; it does not price. New homes only — not commercial work, renovations or fit-outs. One set of numbers, every quote priced against it. ## What makes Scaleline different - **Published, fixed pricing** — per trade, per home, or per month. No "contact us for a quote". - **Every quantity is sourced** — each line carries the drawing page, the dimension read, a confidence figure and a stated accuracy class. - **We measure, we don't price** — clients set no rates with us; trades price their own work. The measurement stays neutral. - **The blind test** — a builder can send drawings for a job they've already built (without the costs); Scaleline measures it blind and shows the variance, line by line. - **Australia-wide, new homes** — the desk is in Adelaide; the wind region and soil class are read from the drawings for that site, in any state. ## What Scaleline is not Scaleline provides estimating and quantity take-off services. It is not a licensed building contractor, a registered surveyor, or an AIQS-certified quantity surveying practice. Estimates are prepared to the accuracy class stated in each report. ## Key pages Paths below are site-relative on purpose — this file is static and cannot read the canonical host. The single source for the host is PUBLIC_SITE_URL / the placeholder fallback in astro.config.mjs (see the LAUNCH SWITCH block). Full plain-text summaries of every core page are in /llms-full.txt. - [Home](/): positioning and overview — one set of numbers, every quote priced against it; the three-quote problem; who it's for (Australian builders putting up about 5–50 new homes a year). - [How it works](/how-it-works): the three-step process (send plans → we measure and check → get your numbers), what drawings to send, and when the 24–48h clock starts. - [Pricing](/pricing): published fixed fees — single trade $449, whole home $1,290, monthly $3,900 (3 whole-home take-offs a month, extra jobs $990 each, priority 24-hour turnaround, unused take-offs carry over one month), what the fee covers and doesn't. - [Sample report](/sample-report): a real, anonymised bill of quantities showing the evidence chain (source page, dimension, confidence), with summary-only lines clearly labelled "Estimate". - [Method & accuracy](/method): the measuring mechanism — vector/text layers first, machine vision second, estimator review, fail-lock on failed checks, per-section accuracy classes, and measurement depth by trade. - [Blind test](/blind-test): test accuracy on a job you've already built — send drawings without costs, we measure blind, variance shown line by line. - [FAQ](/faq): what you get, which trades, how fast, what it costs, accuracy classes, data handling and AI use, local relevance. - [About](/about): the team, Australia-wide new-home scope, why it was built, group-relationship disclosure, and the fairness rules. The office is in Adelaide. - [Trade quotes](/trade-quotes): builders submit one set of drawings; up to three vetted trades per package price the same quantities; quotes come back side by side, originals attached, no ranking. - [For trades](/for-trades): trade-partner program for new residential builds across Australia — you're one of three firms per request, nothing to pay unless you win, success fee on your trade's contract value only. The percentage is not published. - [Apply to join](/for-trades/apply): trade-partner application — company, trades and coverage details; every application gets a reply. - [Fairness](/fairness): how neutrality is kept — quantities locked before any quote, identical scope to every trade, no markup or ranking, who pays the success fee stated, the percentage not published, related parties flagged. - [Get started](/get-started): upload residential drawings (PDF preferred, up to 1GB or secure link) and order a trade-by-trade take-off. - [Contact](/contact): general enquiries and the contact form — hello@scaleline.com.au, +61 8 7110 0011, Adelaide SA. - [Compare your quotes](/compare-quotes): free, anonymous tool — type three quotes you already have and see whether the spread is measurement or price (nothing uploaded). - [Compare quotes (landing)](/compare-your-quotes): entry point for builders diagnosing quote spread before they order a take-off. - [Insights](/insights): article hub on residential take-off and estimating — quantities vs prices, estimating cost, trade-by-trade measuring. ## Blog (legacy inventory) Primary articles live under [Insights](/insights). The `/blog` index may list older posts; one renovation-focused article remains for bookmarks only — **not** a service offer (noindex, excluded from sitemap). Tag archive URLs under `/blog/tag/` are noindex. ## Insights (articles) Complete list below matches `/insights/*` URLs in the sitemap (auto-synced on build). - [Drawing revisions and your bill of quantities: what actually changes](/insights/drawing-revisions-and-your-bill-of-quantities): What to check when a revised drawing set lands after your take-off or tender is already out — how to find what changed, reconcile additions and omissions without a full re-measure, and reissue the pack so subcontractors don't price the old version. - [Tender package checklist for a new home](/insights/tender-package-checklist-for-a-new-home): What to check before you send drawings and a bill of quantities to subcontractors for pricing — drawing revisions, scope split by trade, sourced quantities, written exclusions, and a closing date for questions. - [What drawings to send for a quantity takeoff](/insights/what-drawings-to-send-for-a-quantity-takeoff): What counts as a usable drawing set for a residential quantity takeoff — architectural, structural, specification and schedule — what's required, what's optional, and what happens when something's missing. - [Why your estimate and your quotes will never match — and why that's the whole point](/insights/why-estimate-and-quotes-will-never-match): A measured quantity is a point on the drawing. A trade's quote is their price. Reading one against the other is the job — the gap is not a reason to throw the quantities out. - [SA wind region and soil class: why site classification shapes the take-off](/insights/sa-wind-region-and-soil-class): How SA wind regions and AS 2870 soil classes change the quantities a builder has to price — and why an Adelaide take-off has to read the local conditions, not a national average. - [The blind test: how we measure our own estimating accuracy](/insights/the-blind-test-estimating-accuracy): We don't quote an accuracy percentage — we run a blind test instead. Here's how the estimating accuracy test works, and what the variance actually shows. - [Fixed-price vs hourly estimating: which one protects you](/insights/fixed-price-vs-hourly-estimating): Hourly estimating rewards the hours, not the outcome. Here's how fixed-price vs hourly estimating plays out on a real job, and why a fixed fee changes the incentive. - [How to read a bill of quantities: our sample, line by line](/insights/how-to-read-a-bill-of-quantities): A line-by-line guide to reading a bill of quantities — source page, dimension, confidence, and the difference between a Measured line and an Estimate. - [Onshore vs offshore estimating: what you actually get](/insights/onshore-vs-offshore-estimating): Offshore estimating costs less on paper. Here's what the rate gap actually buys — time zones, drawing conventions, local rules — and what you keep onshore. - [How to take off a roof from plans](/insights/roof-takeoff): How to measure a residential roof from the drawings — roof area, sheet quantities, battens, fascia and gutters, and the pitch factor that changes everything. - [How to take off wall framing from plans](/insights/wall-framing-takeoff): A practical guide to measuring wall framing from residential drawings — studs, plates, lintels, bracing and the openings that change every count. - [How to take off a slab and footings from plans](/insights/slab-and-footings-takeoff): A step-by-step guide to measuring a residential slab and footings from the drawings — slab area, edge beams, waffle pods, reinforcement, and the deductions that are easy to miss. - [How long to quote a house: where the 15–20 hours go](/insights/how-long-to-quote-a-house): Quoting one new home in a spreadsheet takes 15–20 hours. Here's where those hours actually go, and which parts you can hand off without losing control of the number. - [How to take off a Hebel external wall from plans](/insights/hebel-external-wall-takeoff): A practical guide to measuring Hebel PowerPanel external cladding from residential drawings — net wall areas, openings, corners and jointing — and the mistakes that blow the quantity out. - [Why three quotes never match (and it's not the prices)](/insights/why-three-quotes-never-match): When three subcontractor quotes come back wildly different, the usual culprit isn't the rates — it's that each trade measured the job differently. Here's how to fix the comparison. - [What an in-house estimator really costs in 2026](/insights/what-an-in-house-estimator-costs): The all-in first-year cost of hiring a residential estimator in Australia — salary, on-costs, software and ramp-up — and when outsourcing the measuring makes more sense. ## Blog (indexable articles) RSS at /rss.xml. Legacy renovation post and /blog/tag/* hubs are noindex (see above). - [Trade quotes for builders: prices you can compare](/blog/trade-quotes-for-builders): Trade quotes for builders only compare when every subcontractor prices the same quantities. How that works in Adelaide and South Australia. ## Contact Email: hello@scaleline.com.au · Phone: +61 8 7110 0011 · Adelaide, South Australia, Australia.