How long to quote a house: where the 15–20 hours go

Quoting one new home in a spreadsheet takes 15–20 hours. Here's where those hours actually go, and which parts you can hand off without losing control of the number.

Insights Published · 8 min · By Scaleline

For Australian builders of new homes.

A printed residential floor plan with room layouts and dimensions.

How long to quote a house? For a builder working from a spreadsheet, one new home takes roughly 15–20 hours from drawings to a number you can stand behind. That figure comes from the quoting-software industry, not from us — Built Simple lays it out here. The important thing about those hours isn’t the total. It’s that they don’t fall in one block. They’re spread across measuring, pricing, checking and chasing — and only some of those parts need to sit with you.

Why a house quote takes 15–20 hours

The 15–20 hours is the honest number for someone doing it themselves in a spreadsheet. It isn’t padded, and it isn’t a floor either. Quoting one new home means reading a full set of drawings — architectural, structural, electrical, hydraulic — and turning them into a list long enough that a subcontractor can actually price it. Miss a trade and the number is light; double-count a wall and it’s heavy.

What the hours really reflect is repetition. A residential job has dozens of trades, and each trade wants its quantities cut a particular way. The bricklayer wants wall area and openings. The concretor wants slab area, edge beam length and reinforcement. The roofer wants sheet area at the true slope, not the flat plan area. Producing each of those from the same drawings is slow because it’s done one trade at a time, by hand, in a sheet that has no memory of the last job.

Where the hours actually go, line by line

If you split a typical residential quote into its parts, the time looks roughly like this.

The single biggest block is measuring — taking off quantities from the drawings. That is often half the job or more. Then comes pricing: running each line against your rates, a price book, or a handful of past invoices. After that is the part nobody budgets for: checking. Re-totalling a sheet, chasing a wall that was measured twice, reconciling the floor plan against the elevations when the two don’t agree.

There’s also the time that isn’t productive at all. Waiting on a supplier for a rate. Re-reading an email thread to work out which revision of the drawing is current. The hours pile up fastest when a job is interrupted, because picking a half-finished take-off back up means re-establishing where you were before you can add to it.

The spreadsheet is doing more than adding up

When the industry says 15–20 hours, it’s because the spreadsheet has become the estimator, the price book and the checking process all at once. It’s not just adding numbers. It’s holding every assumption — the waste allowance on cladding, the wall height on the far side of the split level, whether the garage slab was read off the architectural or the structural drawing.

That’s also why two builders can quote the same house and take wildly different amounts of time. The difference isn’t speed. It’s how many of those assumptions each one is carrying around in their head versus writing down. The builders who are fastest are usually the ones with the most consistent method — a fixed order of trades, a fixed set of deductions, a fixed way of reading an opening off the schedule instead of scaling it.

None of that is about the tool being fancy. It’s about the process being repeatable. A quoting time spreadsheet only saves you hours if it already encodes your method; otherwise it’s just a blank grid that makes you re-derive the method every single job.

There’s a compounding effect too. When the method is inconsistent, the checking step grows, because nothing can be trusted on sight. A builder who re-derives their deductions every time has to re-check every line, and the re-checking is where a second set of hours quietly disappears. Consistency isn’t a speed trick — it’s what stops a 15-hour quote becoming a 25-hour one across three revisions and two interrupted afternoons.

Measuring is the part you can hand off

Here’s the useful split. Pricing and chasing are yours by nature — only you know your rates, your suppliers and your margin. Measuring is different. A take-off is a mechanical job: read the drawing, extract the quantities, mark where each one came from. It doesn’t require your judgement about price, which is exactly what makes it the part you can outsource without giving up control.

That’s the whole reason we exist. We take the drawings and return a trade-by-trade bill of quantities, every line sourced back to the page and dimension it came from. You keep your rates to yourself and price the quantities we hand back. The measuring hours come off your plate; the number stays yours. You can see what that looks like in our sample report.

What you should not hand off is the checking step that keeps you honest. You still want to be able to open a report and see, line by line, where a figure came from — not just trust that someone counted correctly. If a quantity carries its source, checking takes minutes instead of re-measuring the whole job.

How long a take-off takes when it’s machine and estimator

A take-off doesn’t have to take half a week. Our turnaround is 24–48 hours, and the clock starts from the moment we confirm your drawings are usable — not from when you hit send, and not from when a quote gets accepted somewhere upstream. You can read exactly how that clock is defined on how it works.

The speed comes from splitting the work the same way a careful builder does. An engine reads the vector and text layers of the drawings first — the dimensions the drafter actually wrote down — and a local estimator then checks what the annotations don’t pin down. That’s the pattern behind our method: machine does the bulk, a person does the judgement, and anything that can’t be verified fails rather than shipping half-checked.

The point of stating that plainly is so you can compare like with like. “24–48 hours” and “15–20 hours” sound like two answers to the same question, but they’re not. The first is a turnaround on measuring; the second is the total time to quote a house end to end. Once the measuring is out of your hands, the remaining hours are pricing, checking and deciding — the parts that are genuinely yours.

What to do with the hours you get back

You can’t price a job you can’t trust the quantities on, so you pad — and padding is just a slower way of spending hours you didn’t have. The builders who quote comfortably are the ones who’ve taken the measuring load off the spreadsheet without losing the source of every number.

If you want to test whether your measuring time is the bottleneck, start small. Send us one set of drawings for a trade-by-trade take-off and compare the hours it would have taken you to do it by hand. If the numbers come back with their sources and you can check them in minutes, you’ve found the part of the quote worth handing off.

Send us your plans → or, if you’d rather verify the accuracy before you commit a dollar, book a blind test →.

This is Scaleline’s view. We measure residential jobs from drawings — we don’t price them, and we don’t sell software. Where we mention how we work, it’s to be useful, not to oversell.