Skip to content

Trade Quotes

Up to three quotes. One measure. No bigger job hiding in the price.

For new residential builds across Australia. Quantities are locked first. Then up to three vetted trades price that same list — so a higher quote is a higher rate, and you can see the lines.

Send one set of drawings for a new home build. Each independent trade prices the same measured scope — quotes are passed through as written. You choose who to engage. We are not the subcontractor, and we don’t rank them.

Up to three vetted trades per package. Not an open bidding board.

Three sealed white envelopes lined up in a row on top of a single residential floor plan spread across a builder's desk, photographed from directly above.

Where quotes go wrong

Three quotes can all look reasonable — and still be three different jobs.

One included the light fittings. The others didn’t.

Until the measure is the same, you can’t tell a higher rate from a bigger job. Lock the quantities first, and the comparison is something you can point at.

Why a dearer quote isn’t always a dearer rate → >

Accuracy class

Accuracy classes cover measured quantities; benchmark prices stay indicative — separate on every line.

The estimate is the measure. The quote is the market.

One line. Every quote reads against it.

The line is your quantities extended by an indicative rate. Quotes from independent trades read against it and will land above or below the range. A quantity that does not match the drawing is on us, and we re-issue it.

  • External walls

    External walls, illustrative point 1, below the line. Scope: A return the brief did not carry is left out. Rate: Sits below the line.

    Scope A return the brief did not carry is left out.

    Rate Sits below the line.

    External walls, illustrative point 2, above the line. Scope: Same inclusions as the brief. Rate: Sits above the line.

    Scope Same inclusions as the brief.

    Rate Sits above the line.

    External walls, illustrative point 3, above the line. Scope: Fittings the brief left out are priced in. Rate: Sits above the line.

    Scope Fittings the brief left out are priced in.

    Rate Sits above the line.

  • Slab

    Slab, illustrative point 1, below the line. Scope: Same inclusions as the brief. Rate: Sits below the line.

    Scope Same inclusions as the brief.

    Rate Sits below the line.

    Slab, illustrative point 2, above the line. Scope: An extra excavation the brief did not carry is priced in. Rate: Sits above the line.

    Scope An extra excavation the brief did not carry is priced in.

    Rate Sits above the line.

  • Framing

    Framing, illustrative point 1, below the line. Scope: An opening the brief carried is left out. Rate: Sits below the line.

    Scope An opening the brief carried is left out.

    Rate Sits below the line.

    Framing, illustrative point 2, above the line. Scope: Same inclusions as the brief. Rate: Sits above the line.

    Scope Same inclusions as the brief.

    Rate Sits above the line.

    Framing, illustrative point 3, above the line. Scope: A lintel the brief left out is priced in. Rate: Sits above the line.

    Scope A lintel the brief left out is priced in.

    Rate Sits above the line.

Each point, written out

  • External walls · point 1 · below the line

    Scope A return the brief did not carry is left out.

    Rate Sits below the line.

  • External walls · point 2 · above the line

    Scope Same inclusions as the brief.

    Rate Sits above the line.

  • External walls · point 3 · above the line

    Scope Fittings the brief left out are priced in.

    Rate Sits above the line.

  • Slab · point 1 · below the line

    Scope Same inclusions as the brief.

    Rate Sits below the line.

  • Slab · point 2 · above the line

    Scope An extra excavation the brief did not carry is priced in.

    Rate Sits above the line.

  • Framing · point 1 · below the line

    Scope An opening the brief carried is left out.

    Rate Sits below the line.

  • Framing · point 2 · above the line

    Scope Same inclusions as the brief.

    Rate Sits above the line.

  • Framing · point 3 · above the line

    Scope A lintel the brief left out is priced in.

    Rate Sits above the line.

Illustrative layout only. Not a measured result from a built job.

How it works

One submission. One list. Up to three prices against it.

  1. 01

    Send us your plans

    One set of drawings. Tell us the site address, the project type, and which trades you need priced.

  2. 02

    We approach up to three vetted trades per package

    Same scope brief, same quote format, so the numbers are comparable. We do the following up.

  3. 03

    You get a side-by-side comparison

    Every quote we receive, aligned line by line, with the originals attached. You choose.

We come back to you within 3 business days.

Not an open bidding board

Three quotes per trade, not thirty.

Enough to compare a rate. Not so many that you’re sorting noise instead of the job.

Three sealed quote envelopes standing upright in a timber desk organiser, with a timber-framed house behind and plans on the desk in front.
  1. 01

    Three, not thirty.

    Enough to spot an outlier, few enough to actually read.

  2. 02

    We pass on every quote we receive.

    We don’t rank them, score them, or tell you which to take. That call is yours.

  3. 03

    Vetted before they join.

    Licence, registration and insurance checked before any partner joins.

  4. 04

    Your drawings stay yours.

    They’re used to obtain your quotes and nothing else — not shared with any other company in our group.

Compare scope first, then rate. Scope gaps show line by line; quantity errors are on us.

Illustrative

Aligned line by line

Line Quote 1 Quote 2 Quote 3
Light fittings Included Not included Not included
External lighting trench The electrician assumed the landscaper was doing this. Not included Not included Not included

One included the light fittings. The others didn’t. Quotes are passed on as written. We don’t rank them.

Read our fairness rules →

One set of numbers

Every trade prices the list you can point at.

A single printed quantity schedule held flat under a steel ruler on a builder’s desk, with pricing pads fanned beneath it all aligned to the same sheet.

Before the plans go out, we write the inclusions and exclusions. Everyone prices that list, so a gap shows up as a line — not as a story you have to untangle in the room.

That’s how a gap shows up early — the trench for the external lighting that the electrician assumed the landscaper was doing — instead of in the room, after you’ve already nodded.

If you’ve already had us measure the job, your quotes are priced against that bill of quantities. If you’re starting from drawings, we build the scope brief for you.

Same list in. Comparable quotes out.

See the method →

Who this is for

Built for whoever’s holding the drawings.

  • Builders of new homes, including a new suburb or another state
  • Developers and landowners with drawings for a new house
  • Anyone whose regular subbie can’t fit a new-home package

Trades we cover

Electrical · Plumbing · Tiling · Cabinetry · Flooring · Landscaping · Windows & doors

  • Electrical
  • Plumbing
  • Tiling
  • Cabinetry
  • Flooring
  • Landscaping
  • Windows & doors

Not listed? Ask us — we’ll tell you honestly whether we have coverage.

An Australian brick house at lock-up stage with several trades working at once — a roof plumber laying sheeting, a bricklayer at a wall and an electrician carrying conduit through the garage opening.

Send us your plans

Send the drawings. We’ll lock the measure before anyone prices it.

The site address, the project type and the trades you need priced. We’ll come back to you within 3 business days.

Project type

New residential build. Not a renovation, fit-out or commercial job.

Trades you need priced

PDF, DWG, DXF, JPG, PNG, ZIP — up to 1 GB per file, or paste a secure link below.

No obligation · You choose who to work with.

FAQ

Before you hand a trade a number.

How many quotes will I get?

Up to three vetted partners per trade. If one doesn’t respond or declines, we’ll tell you — rather than quietly substituting someone else.

Can I speak to the trades directly?

Yes. Many quotes need a site inspection, and we’d rather that happened properly. We just ask to be kept in the loop.

Do you mark up the quotes?

No. Quotes reach you exactly as the partner wrote them, with the originals attached alongside our comparison.

What happens to my drawings?

They’re used to obtain your quotes and nothing else. They aren’t shared with any other company in our group, and partners receive them under confidentiality.

Why is my quote different from the estimate?

A benchmark is an indicative range. A quote is one trade’s price for this job. Match the scope first. The quantity does not change — if it misses the drawing, we re-issue it. A price gap is the variance you came for.

See all FAQs →

Start with the numbers.

Send your plans for a take-off first — then decide whether to collect quotes on the same bill of quantities.