What drawings to send for a quantity takeoff

What counts as a usable drawing set for a residential quantity takeoff — architectural, structural, specification and schedule — what's required, what's optional, and what happens when something's missing.

Insights Published · 7 min · By Scaleline

For Australian builders of new homes.

A squared-up vertical stack of large architectural sheets on a desk beside a rolled set standing in a black document tube.

What drawings to send for a quantity takeoff comes down to one test: can a measurer open the set and find every dimension a trade needs, without guessing? For a new Australian home build, that usually means the architectural (working drawing) set at minimum, the structural set and specification when you have them, and — if the job has a lot of openings — a window and door schedule. Here’s what each document actually does for the measure, which ones are required versus optional, and what happens if the set isn’t complete yet.

The architectural set is the minimum — and it carries most trades

The architectural or “working drawing” set is the floor plans, elevations and sections that show the building’s layout, dimensions and finishes. It’s the one document every residential takeoff needs, because it’s where most trade quantities actually come from — wall lengths, floor areas, roof pitch, opening sizes, room-by-room finishes.

Send it as a PDF with a scale bar or a stated scale, so the measurer can confirm the drawing is to scale rather than assuming it. A set that’s missing a scale reference, or that only shows some levels of a multi-storey home, can’t be measured on the first pass.

Structural drawings and a specification sharpen specific trades — they’re not required for every line

A structural set — footing and slab layout, framing and bracing details — sharpens the trades that depend on structural information: concrete, slab and footings, and framing. Without it, those trades can often still be measured off the architectural plan, but the quantity leans more on the architectural dimensions alone rather than on engineering detail.

A specification does the same job for finishes. It names products, materials and fixtures — the difference between “external cladding” as a generic line and a specific cladding system at a specific coverage rate. If you have one, send it; it firms up the finishing trades. If you don’t have one yet, the takeoff can still proceed off the drawings, with finishes measured at a general level until a spec is available.

Neither document replaces the architectural set, and neither is required to start — but both narrow the gap between “a quantity” and “a quantity you can price with confidence.”

A window and door schedule matters most when a job has a lot of openings

A window and door schedule is a table that lists every opening in the job by a unique code, with its size, type and hardware — that’s the standard definition used across Australian architectural documentation. On a small home with a handful of openings, the architectural plan alone is usually enough — each window or door can be read straight off the floor plan and elevations.

On a job with many openings, or repeated opening types that are easy to mix up on a plan alone, a schedule is what lets the count be checked against a reference other than the drawing itself — each opening has its own code, so a window counted on the floor plan can be cross-checked against the same code in the schedule. If your architect or drafter has produced one, include it; if not, the openings still get measured off the plan and elevations, just without that second reference to check the count against.

None of this extends to a structural or compliance judgement on any individual opening — a schedule and a set of elevations tell a measurer what’s there and how many, not whether an opening meets a structural or code requirement. That judgement sits with your architect or engineer, not with a takeoff.

What happens when the set isn’t complete

A takeoff doesn’t stall silently when something’s missing — the process is built to flag it. If the drawings aren’t complete enough to measure — a missing level, no scale reference, a schedule referenced on a plan but not supplied — you get an email listing exactly what’s missing before the 24–48 hour clock starts. The clock runs from when the drawings are confirmed usable, not from upload, so sending an incomplete set doesn’t cost you the turnaround — it just delays the start of it until the gap is filled.

This is also why it’s worth sending the most recent, dated revision of each sheet rather than an earlier draft — a measure built against a superseded plan has to be redone once the current version turns up, which costs more time than sending the right one first.

What to send, in order of value

If you’re assembling a set to start a job, this is the order that gets you the firmest number fastest:

  1. Architectural/working drawings — floor plans, elevations, sections, to scale or with a stated scale. Required.
  2. Structural drawings — footing, slab and framing details, if available. Sharpens concrete, slab and framing trades.
  3. Specification — products, materials, fixtures, if available. Sharpens finishing trades.
  4. Window and door schedule — if the job has many openings or your drafter has already produced one.

A single floor plan or one trade’s drawings is enough to open a job and get a fixed fee confirmed — you don’t need the full set in hand before you start the conversation. Read more on the method behind the measure, or start with one floor plan or a single trade and send the rest of the set once you’re ready to order.

This is Scaleline’s view. We measure residential jobs from drawings — we don’t price them, and we don’t sell software. Where we mention how we work, it’s to be useful, not to oversell.